KRISHI
ICAR RESEARCH DATA REPOSITORY FOR KNOWLEDGE MANAGEMENT
(An Institutional Publication and Data Inventory Repository)
"Not Available": Please do not remove the default option "Not Available" for the fields where metadata information is not available
"1001-01-01": Date not available or not applicable for filling metadata infromation
"1001-01-01": Date not available or not applicable for filling metadata infromation
Please use this identifier to cite or link to this item:
http://krishi.icar.gov.in/jspui/handle/123456789/60658
Title: | Feasibility assessment of renewable energy resources for tea plantation and industry in India -A review |
Other Titles: | Not Available |
Authors: | Ravi Kumar Kandasamy Kavya Dashora Naveen Krishnan S. Sanyal Hukum Chandra S. Dharmaraja Vandita Kumari |
ICAR Data Use Licennce: | http://krishi.icar.gov.in/PDF/ICAR_Data_Use_Licence.pdf |
Author's Affiliated institute: | Indian Institute of Technology Delhi ICAR::Indian Agricultural Statistics Research Institute |
Published/ Complete Date: | 2021-07-30 |
Project Code: | Not Available |
Keywords: | Tea industry Renewable energy technologies Biomass Solar PV Wind turbine Micro-hydro |
Publisher: | Elsevier |
Citation: | Kumar, K. R., Dashora, K., Krishnan, N., Sanyal, S., Chandra, H., Dharmaraja, S., Kumari, V. (2021). Feasibility Assessment of Renewable Energy Resources for Tea Plantation and Industry in India - A Review. Renewable and Sustainable Energy Reviews, 145, 111083. |
Series/Report no.: | Not Available; |
Abstract/Description: | In tea production, India ranks second largest in the world, after China. Indian tea industry is one of the largest in the world and with over 13,000 gardens and produces 1350 million kg of tea leaves. Tea production and processing require electrical and thermal energy in various processes such as irrigation, withering, rolling, fermentation, drying, sorting/grading, and packaging. To produce one kg of tea requires thermal and electrical energy in the range of 4.45–6.84 kWh and 0.4–0.7 kWh respectively. In tea gardens, diesel generators are commonly used for irrigational needs in off-grid areas. In tea industry, fossil fuels such as coal, low sulphur diesel are mostly used to encounter the thermal energy needs and these energy sources heavily pollute the environment. This is a serious cause of concern for all including national and international agencies. These conventional fuels may be replaced by suitable renewable energy resources to meet the energy demand of tea plantations and industries. The identification of suitable renewable energy technologies to satisfy the energy requirement of both tea plantation and industry for north-eastern states and the southern part of India are reviewed extensively and the technological barriers are delineated. |
Description: | Not Available |
ISSN: | Not Available |
Type(s) of content: | Research Paper Review Paper |
Sponsors: | Not Available |
Language: | English |
Name of Journal: | Renewable and Sustainable Energy Reviews |
NAAS Rating: | 18.11 18.11 |
Impact Factor: | 14.982 |
Volume No.: | 145 |
Page Number: | 111083 |
Name of the Division/Regional Station: | Not Available |
Source, DOI or any other URL: | https://doi.org/10.1016/j.rser.2021.111083 |
URI: | http://krishi.icar.gov.in/jspui/handle/123456789/60658 |
Appears in Collections: | AEdu-IASRI-Publication |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Feasibility study for renewable energy resources for tea plantation.pdf | 5.65 MB | Adobe PDF | View/Open |
Items in KRISHI are protected by copyright, with all rights reserved, unless otherwise indicated.