Skip navigation
DSpace logo
  • Home
  • Browse
    • SMD
      & Institutes
    • Browse Items by:
    • Published/ Complete Date
    • Author/ PI/CoPI
    • Title
    • Keyword (Publication)
  • Sign on to:
    • My KRISHI
    • Receive email
      updates
    • Edit Profile
ICAR logo

KRISHI

ICAR RESEARCH DATA REPOSITORY FOR KNOWLEDGE MANAGEMENT
(An Institutional Publication and Data Inventory Repository)


  1. KRISHI Publication and Data Inventory Repository
  2. Horticultural Science A7
  3. ICAR-National Research Centre for Grapes L1
  4. HS-NRCG-Publication
"Not Available": Please do not remove the default option "Not Available" for the fields where metadata information is not available
"1001-01-01": Date not available or not applicable for filling metadata infromation
Please use this identifier to cite or link to this item: http://krishi.icar.gov.in/jspui/handle/123456789/47644
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSomkuwar, R. G., J. Satisha and S. D. Ramtekeen_US
dc.date.accessioned2021-07-10T05:44:51Z-
dc.date.available2021-07-10T05:44:51Z-
dc.date.issued2009-01-01-
dc.identifier.citationSomkuwar, R. G., J. Satisha and S. D. Ramteke. 2009 Propagation success in relation to time of grafting in Tas-A-Ganesh grapes.J. Mah. Agril. Uni., 34(1): 113-114en_US
dc.identifier.issnNot Available-
dc.identifier.urihttp://krishi.icar.gov.in/jspui/handle/123456789/47644-
dc.descriptionNot Availableen_US
dc.description.abstractAn experiment was conducted in Pune, Maharashtra, India, during July to December 2002. Rooted cuttings of grape rootstock Dog Ridge were planted in the field in January 2002 at a spacing of 10′ × 6′ distance, and 2-3 healthy and well-matured shoots per plant were retained for grafting. The wedge grafting was performed with grape cv. Tas-A-Ganesh as scion (using shoots of 6-8 mm thick) on 8 different dates, i.e. 1 July, 15 July, 30 July, 15 August, 30 August, 15 September, 30 September and 15 October. The grafting date significantly influenced the days taken for sprouting, percentage bud sprout, shoot diameter and percentage successful graft. The grafting performed on 15 September and 15 August had taken relatively less time (10.30 and 13.78 days, respectively) for buds to sprout compared to grafting on 1 July. The thickest shoot was recorded with grafting on 30 July and 15 August. No significant differences were found for shoot and internodal lengths. The percentage bud sprout was maximum (98.47%) when the grafting was performed on 15 September, followed by 30 August. The minimum bud sprout (72.48%) was recorded with grafting on 1 July.en_US
dc.description.sponsorshipNot Availableen_US
dc.language.isoEnglishen_US
dc.publisherNot Availableen_US
dc.relation.ispartofseriesNot Available;-
dc.subjectTime of grafting, Tas-A-Ganesh grapesen_US
dc.titlePropagation success in relation to time of grafting in Tas-A-Ganesh grapesen_US
dc.title.alternativeNot Availableen_US
dc.typeResearch Paperen_US
dc.publication.projectcodeNot Availableen_US
dc.publication.journalnameJournal of Maharashtra Agricultural Universityen_US
dc.publication.volumeno34(1)en_US
dc.publication.pagenumber113-114en_US
dc.publication.divisionUnitNot Availableen_US
dc.publication.sourceUrlNot Availableen_US
dc.publication.authorAffiliationICAR-NRC for Grapes, Puneen_US
dc.ICARdataUseLicencehttp://krishi.icar.gov.in/PDF/ICAR_Data_Use_Licence.pdfen_US
Appears in Collections:HS-NRCG-Publication

Files in This Item:
There are no files associated with this item.
Show simple item record


Items in KRISHI are protected by copyright, with all rights reserved, unless otherwise indicated.

  File Downloads  

Jul 2022: 2038 Jun 2022: 106240 May 2022: 97531 Apr 2022: 94186 Mar 2022: 96096 Feb 2022: 93736

Total Download
2817790

(Also includes document to fetched through computer programme by other sites)
( From May 2017 )

ICAR Data Use Licence
Disclaimer
©  2016 All Rights Reserved  • 
Indian Council of Agricultural Research
Krishi Bhavan, Dr. Rajendra Prasad Road, New Delhi-110 001. INDIA

INDEXED BY

KRISHI: Inter Portal Harvester

DOAR
Theme by Logo CINECA Reports

DSpace Software Copyright © 2002-2013  Duraspace - Feedback