On the expected output of two-stage production systems with multi-type rework
DSpace at IIT Bombay
View Archive InfoField | Value | |
Title |
On the expected output of two-stage production systems with multi-type rework
|
|
Creator |
GOPALAN, MN
KANNAN, S |
|
Description |
This paper deals with the transient analysis of a two-stage transfer-line production systems subject to inter-stage inspection and rework. It provides an integrated framework to consider manufacturing, inspection and rework activities simultaneously in two-stage production systems. The system is provided with an initial storage of unlimited capacity. Rework of a defective item produced by machine I is done on machine I itself and the distribution of the processing time of rework depends on type of defect machine I produces. Explicit expressions for some of the system characteristics have been obtained using the state-space method and regeneration point technique. All the random variables involved in the analysis are assumed to be arbitrarily distributed.
|
|
Publisher |
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH
|
|
Date |
2011-07-18T15:25:51Z
2011-12-26T12:50:41Z 2011-12-27T05:36:40Z 2011-07-18T15:25:51Z 2011-12-26T12:50:41Z 2011-12-27T05:36:40Z 1996 |
|
Type |
Article
|
|
Identifier |
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 13(1), 29-41
0217-5959 http://dspace.library.iitb.ac.in/xmlui/handle/10054/4967 http://hdl.handle.net/10054/4967 |
|
Language |
en
|
|