EXPECTED DURATION ANALYSIS OF A 2-STAGE TRANSFER-LINE PRODUCTION SYSTEM SUBJECT TO INSPECTION AND REWORK
DSpace at IIT Bombay
View Archive InfoField | Value | |
Title |
EXPECTED DURATION ANALYSIS OF A 2-STAGE TRANSFER-LINE PRODUCTION SYSTEM SUBJECT TO INSPECTION AND REWORK
|
|
Creator |
GOPALAN, MN
KANNAN, S |
|
Subject |
production systems
stochastic models regeneration points rework and transient states |
|
Description |
This paper provides a complete framework to consider manufacturing, inspection and rework activities in two-stage transfer-line production systems. The purpose of this paper is to analyse some of the transient state characteristics of a two-stage production system subject to an initial buffer of infinite capacity, inspection at both the inter- and end-stages and rework. The first stage of the system is never starved and the second stage is never blocked. A stochastic model is developed to analyse the system and explicit analytical expressions for some of the system characteristics have been obtained using the state-space method and regeneration point technique. All the random variables involved in the analysis are assumed to be arbitrary (general). Numerical illustrations have also been presented for some particular cases.
|
|
Publisher |
STOCKTON PRESS
|
|
Date |
2011-08-30T15:02:12Z
2011-12-26T12:59:01Z 2011-12-27T05:49:50Z 2011-08-30T15:02:12Z 2011-12-26T12:59:01Z 2011-12-27T05:49:50Z 1994 |
|
Type |
Article
|
|
Identifier |
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 45(7), 797-805
0160-5682 http://dx.doi.org/10.1038/sj/jors/0450706 http://dspace.library.iitb.ac.in/xmlui/handle/10054/12361 http://hdl.handle.net/10054/12361 |
|
Language |
en
|
|