Record Details

Simultaneously targeting for the minimum water requirement and the maximum production in a batch process

DSpace at IIT Bombay

View Archive Info
 
 
Field Value
 
Title Simultaneously targeting for the minimum water requirement and the maximum production in a batch process
 
Creator CHATURVEDI, ND
BANDYOPADHYAY, S
 
Subject Batch process
Multiple objective optimization
Fresh water minimization
Flexible schedule
Process integration
Maximum production
CONTINUOUS-TIME FORMULATION
MULTIOBJECTIVE OPTIMIZATION
WASTE-WATER
OBJECTIVE OPTIMIZATION
SCHEDULING TECHNIQUE
PROCESS INDUSTRIES
NETWORK SYNTHESIS
MILP FORMULATION
DESIGN
MINIMIZATION
 
Description This work proposes a multiple objective formulation to simultaneously target the minimization of fresh water requirement and the maximization of production in a batch process. The proposed mixed integer linear programming formulation includes scheduling (such as allocation constraints, time constraints, capacity constraints, mass balances, etc.) as well as fresh water minimization constraints (such as concentration, flow requirements, etc.) and illustrated through an example. The trade-offs between the production and the fresh water requirement is captured through the Pareto optimal front. The Pareto optimal front consists of discrete points and facilitates decision maker to select an appropriate operating point based on other process constraints. Furthermore, it has been demonstrated that due to non-convexity of the model, weighted objective method fails to identify all the Pareto optimal points. (C) 2014 Elsevier Ltd. All rights reserved.
 
Publisher ELSEVIER SCI LTD
 
Date 2014-12-28T17:42:28Z
2014-12-28T17:42:28Z
2014
 
Type Article
 
Identifier JOURNAL OF CLEANER PRODUCTION, 77105-115
0959-6526
1879-1786
http://dx.doi.org/10.1016/j.jclepro.2013.11.079
http://dspace.library.iitb.ac.in/jspui/handle/100/17017
 
Language English