LAND RESOURCE INVENTORY AND SOCIO-ECONOMIC STATUS OF FARM HOUSEHOLDS FOR WATERSHED PLANNING AND DEVELOPMENT PASPOL-1 (4D2D6B1b) MICROWATERSHED Gurumitkal, Yadgir and Balichakra Hoblis, Yadgir Taluk and District, Karnataka

KRISHI: Publication and Data Inventory Repository

View Archive Info
 
 
Field Value
 
Title LAND RESOURCE INVENTORY AND SOCIO-ECONOMIC STATUS OF FARM HOUSEHOLDS FOR WATERSHED PLANNING AND DEVELOPMENT PASPOL-1 (4D2D6B1b) MICROWATERSHED Gurumitkal, Yadgir and Balichakra Hoblis, Yadgir Taluk and District, Karnataka
Not Available
 
Creator Rajendra Hegde, Ramesh kumar, S.C., B.A. Dhanorkar, S. Srinivas, M.Lalitha, K.V. Niranjana, R.S. Reddy and S.K. Singh
 
Subject Details of Soil Survey, Soil constraints, Soil and Water Conservation, Soil Suitability, Economic Land Evaluation, Watershed Planning, Sujala – III Project
 
Description Not Available
The land resource inventory of Paspol-1 Microwatershed was conducted using
village cadastral maps and IRS satellite imagery on 1:7920 scale. The false colour
composites of IRS imagery were interpreted for physiography and the physiographic
delineations were used as base for mapping soils. The soils were studied in several
transects and a soil map was prepared with phases of soil series as mapping units.
Random checks were made all over the area outside the transects to confirm and validate
the soil map unit boundaries. The soil map shows the geographic distribution and extent,
characteristics, classification, behavior and use potentials of the soils in the
microwatershed.
The present study covers an area of 522 ha in Yadgir taluk & district, Karnataka.
The climate is semiarid and categorized as drought-prone with an average annual
rainfall of 866 mm, of which about 652 mm is received during south-west monsoon, 138
mm during north-east and the remaining 76 mm during the rest of the year. An area of
508 ha in the microwatershed is covered by soils and 14 ha by others (habitation and
water body). The salient findings from the land resource inventory are summarized
briefly below.
 The soils belong to 11 soil series and 13 soil phases (management units) and 7 land
management units.
 The length of crop growing period is about 120-150 days starting from 1st week of
June to 4th week of October.
 From the master soil map, several interpretative and thematic maps like land
capability, soil depth, surface soil texture, soil gravelliness, available water
capacity, soil slope and soil erosion were generated.
 Soil fertility status maps for macro and micronutrients were generated based on the
surface soil samples collected at every 320 m grid interval.
 Land suitability for growing 29 major agricultural and horticultural crops was
assessed and maps showing the degree of suitability along with constraints were
generated.
 Entire area in the microwatershed is suitable for agriculture.
 About 13 per cent area are very shallow to shallow (150 cm).
 About 13 per cent area in the microwatershed has sandy, 38 per cent area loamy
and 47 per cent clayey soils at the surface.
 Maximum of 69 per cent area in the microwatershed is non gravelly (200 mm/m) in
available water capacity,
Watershed Development Department, Government of Karnataka (World Bank Funded) Sujala –III Project
 
Date 2021-07-25T01:46:57Z
2021-07-25T01:46:57Z
2019-12-31
 
Type Project Report
 
Identifier Rajendra Hegde, Ramesh kumar, S.C., B.A. Dhanorkar, S. Srinivas, M.Lalitha, K.V. Niranjana, R.S. Reddy and S.K. Singh (2019). “Land Resource Inventory and Socio- Economic Status of Farm Households for Watershed Planning and Development of Paspol-1 (4D2D6B1b) Microwatershed, Gurumitkal, Yadgir and Balichakra Hobli, Yadgir Taluk and District, Karnataka”, ICAR-NBSS&LUP Sujala MWS Publ.308, ICAR – NBSS & LUP, RC, Bangalore. p.135 & 35.
Not Available
http://krishi.icar.gov.in/jspui/handle/123456789/50020
 
Language English
 
Relation 308;
 
Publisher ICAR::National Bureau of Soil Survey and Land Use Planning, Regional Centre, Bengaluru & Watershed Development Department, Government of Karnataka (Sujala-III Project)